There is no abstract available for this article.
This work was supported by National Natural Science Foundation of China (Grant No. U1613225) and Peng Cheng Laboratory.
Appendixes A–E.
[1] Kadrou Y, Najid N M. A new heuristic to solve RCPSP with multiple execution modes and Multi-Skilled Labor. In: Proceedings of Computational Engineering in Systems Applications, Beijing, 2006. 2: 1302--1309. Google Scholar
[2] Santos M A, Tereso A P. On the multi-mode, multi-skill resource constrained project scheduling problem (MRCPSP-MS). 2010. https://repositorium.sdum.uminho.pt/bitstream/1822. Google Scholar
[3] Santos M A, Tereso A P. On the multi-mode, multi-skill resource constrained project scheduling problem: a software application. In: Soft computing in industrial applications. Berlin: Springer, 2011. 239--248. Google Scholar
[4] Almeida B F, Correia I, Saldanha?\da?\Gama F. Modeling frameworks for the multi?skill resource?constrained project scheduling problem: a theoretical and empirical comparison. Intl Trans Op Res, 2019, 26: 946-967 CrossRef Google Scholar
[5] Almeida B F, Correia I, Saldanha-da-Gama F. Priority-based heuristics for the multi-skill resource constrained project scheduling problem. Expert Syst Appl, 2016, 57: 91-103 CrossRef Google Scholar